Category Archives: 009

Laid out

Seen above is probably the most progress I’ve made on a model railway in more years than I care to remember. Being able to have a dedicated space at home for the layout has been a real benefit – I … Continue reading

Posted in 009, amberley, fairlight, industrial, inspiration, model railways, narrow gauge, preservation | Comments Off on Laid out

A few steps forward

Uncharacteristically, I’ve been pushing on with track laying rather than procrastinating. It seemed to make sense to use a sub base on top of the foil surface of the insulation board, both to allow flexibility in the layout and to … Continue reading

Posted in 009, fairlight, lxd2, model railways, narrow gauge | Comments Off on A few steps forward

Carpaccio of Celotex

Progress on the new layout has been slow over the past few months, but not non-existent. Having bought a large sheet of 100m thick insulation board (the yellow stuff) I’ve cut it down to form the three main baseboard sections. … Continue reading

Posted in 009, fairlight, model railways, narrow gauge | Comments Off on Carpaccio of Celotex

Fairlight wagon works grinds into action

The first completed wagons built for Fairlight 2.0 – actually if you look back through the archives of this blog you’ll find they’re probably the first completed anything for some time. I would say that I am not one of … Continue reading

Posted in 009, ego trips, kits, model railways, narrow gauge | Comments Off on Fairlight wagon works grinds into action

Sussex Downs 009 Group open day 2017

Well it’s been a while since I’ve done one of these posts. Saturday was the (by my count) sixth members’/open day run by the Sussex Downs group of the 009 Society – held at Lancing parish hall this was a … Continue reading

Posted in 009, exhibition, model railways, narrow gauge, O14, O16.5 | Comments Off on Sussex Downs 009 Group open day 2017